"Live The Dream"


Project Page - Gertrud

Gertrud


3-4 Bedrooms  I  Holiday Let



Creating amazing spaces and experiences


Gertrud

Flexible

Gertrud is technically a Summerhouse - some summerhouse! Whatever use you put Gertrud to we are sure your thinking is likely not as a summerhouse - but who knows?

At 130 square metres Gertrud is an impressive log building by any measure, with three/four bedrooms including three double bedrooms, with the rest of the house in comfortable proportions.

Gertrud is a building designed to face one way - to the sun and/or the best view, arriving at the front, it’s the rear where Gertrud comes together to create a fabulous holiday home or holiday let with large windows allowing users to make the best of the view available with its large windows or doors.

   


Gertrud - Floors 1 I 129.6 m2 I Entrance Hall I WC I Kitchen/Diner I Dining Area I Lounge I Beds 3 +1 I Linen Store I Shower I Sauna I Deck 70.9 m2 I Ext Store

Ground Floor Plans (clockwise from top left)

  1. Double Bedroom
  2. Lounge
  3. Dining Room
  4. Single Bedroom I Study I Home Office
  5. Rear Entrance I Utility Room
  6. Sauna I Bathroom
  7. External Store
  8. Store
  9. WC
  10. Front Entrance I Cloaks
  11. Kitchen I Dining
  12. Double Bedroom
  13. Double Bedroom

Planning, Build, Value, Longevity & the Environment

Most buildings in our portfolio will require planning permission, if you are not familiar with the planning process then it can be something of a minefield and professional help should always be sought, to help you we have produced a handy quide which explains how the process works - click on the icon below.


Our buildings benefit from fast build times once on site - assembly takes between 1 and 5 weeks depending on the size and complexity? Unlike traditional building methods which typically take between 6 to 12 months and are dependant on the weather.


Build costs for traditional building methods range from around £2,700 per square metre to over £3,000 per square metres for a higher spec build - the costs then for a typical 4 bed home, depending on the location, will come out at around £400,000. Your log building once committed to manufacture will be fixed in price, no budgetting for cost over-runs as is the norm of conventional build methods and we will be considerably more cost-effective to build, saving you time and money!


Whilst Ritsu make use of modern processing and production methods, the basic design principles are those of log homes that have been in use of hundreds of years - tried and tested then, when we say your building should last for 100 years or more, it's based on experience, not supposition.


Finally, you will be buying a log building that is amongst the most environmentally friendly buildings available, and also, one of the healthiest environments in which to live and work.


You might also like.....

Our helpful

Planning

Guide

Ritsu

and the

Environment

Click

for

Technical Info

Other Businesses

Share by: